Tuesday, July 24, 2012

RV Remodel 5

Our next project was to work on the hot water area that was under the rear bed.  We noticed some damage along the bottom wall framing.  Luckily it was the only damage on that side! 

We had to remove the hot water heater to get a good look at what was happening.

 Water heater removed.  Damage to flooring and bottom of framing.


Peeling up the linolium to see how far the damage on the floor was.  Luckily this was the only part of the floor that had any damage.

Jig saw out cutting up the rotten floor.

Our dog Lulu likes the new opening in the side.  It's just her size!

 Under the bed where the electrical panel is and the hot water heater.

Flooring cut away ready to put in a new piece of plywood.  We are also moving the electrical box so that you can also reach it from the outside storage under the bed.
Flooring patched and new bottom framing done!  Another side down!

Dear hubby had enough time before going to work to replace some of the rafters over our bed.  He gets alot done in a little bit of time!

Until next time....

Bonnie


No comments:

Post a Comment